Wednesday, July 24, 2013

Which State Has The Worst Roads

“I do not think it is an exaggeration to say history is largely a history of inflation, usually inflations engineered by governments for the gain of governments.” — Friedrich August von Hayek

When I moved to California from Ohio in 1962 construction on the Interstate Highway System was in full bloom. States across the land were building bridges, buy rights of way, and laying down miles of concrete roadway.

Upon arrival in California I accepted a position as a highway engineering technician for the California Division of Highways (now Caltrans) and began working on the Santa Monica Freeway (I-10) in Los Angeles. We were building eight lanes of concrete roadway from downtown Los Angeles to the Coast Highway in Santa Monica. We were excited over what we were doing and thought this superhighway would solve much of the traffic problems in getting from Los Angeles to Santa Monica.

At the time we were building the Santa Monica Freeway there were hundreds of miles on freeway being built in Los, Angels, Ventura, and Orange counties the area covered by the district I worked for.

At the same time other states were building their interstates and as always when a massive undertaking such as the Interstate Highway System is underway there will be those who will take advantage of the program. Two examples come to mind. The first was the construction of the Tampa Bay causeway where the contractor used sea water to mix his concrete. The salt in the sea water weakens the strength of the concrete and will shorten its life. When this was discovered by inspectors from the Bureau of Public Roads (now the Department of Transportation) the project was stopped, the weaken concrete removes and replaces and the contractor ended up in jail.

The second example was discovered just east of my home town of Cleveland Ohio on the newly constructed I-90. When the roadway was opened a reporter to the Cleveland Plain Dealer was driving along the road just after a heavy rain storm. He noticed large puddles of water (birdbaths in the lexicon of highway engineers) and thought that this should not be happening. He began to write a series of articles about the condition of the roadway. These article brought attention to the Ohio Highway Department and they began an investigation as to why the roadway was sinking in spots. When they conducted test borings they discovered that the sub-base rather than being the required 8 inches thick was only 4 inches. It seems as the contractor has cheated on the sub-base charging for 8 inches while only delivering 4 inches. This amounts to 3097.6 cubic yards per mile for a dual roadway. As you can see if the contract was for a 10 mile section your about talking 31,000 cubic yards of expensive sub base material.

There were other scandals involving the Interstate program including interchanges to nowhere in the desert except dirt roads leading to ranches bids going to friends of local politicians.

Not all states were involved in these scandals and California was considered a model for the building of the Interstate System. This lead NBC’s Huntley-Brinkley Report to do a special on the Great Interstate Scandal where they exposed all of the shenanigans going on across the nation. They also closed their report with a segment on how to do it right. For that segment they brought their camera crews to the project I was working on. Of course they had Governor Pat Brown, the highway department’s chief engineer and our district engineer on site for the filming. They even took shots of my survey crew doing some work and interviewed one of the members.

In 1963 California was considered a model for all states to follow when building their highways. The Golden State was ranked as number one in the nation.

But all of that has changed. Now California is ranked number 47 for their roads. Even with the highest motor fuel taxes in the nation California is at the bottom of the list only ahead of Hawaii. Rhode Island, and Alaska.

The Libertarian Think Tank Reason Foundation has just released their annual report on the condition of our national highways. Their report states:

“The nation’s road conditions show slight improvement; North Dakota, Kansas and Wyoming have the best, most cost-effective highway systems and that Alaska, Rhode Island, Hawaii and California have the worst highway systems in study of pavement condition, congestion, deficient bridges, fatalities and cost-effectiveness.”

Reason Foundation’s Annual Highway Report measures the condition and cost-effectiveness of state-owned roads in 11 categories, including pavement condition on urban and rural Interstates, urban traffic congestion, deficient bridges, unsafe narrow lanes, traffic fatalities, total spending per mile of state roads and administrative costs per mile. The study’s rankings are based on data that states reported to the federal government for 2009, the most recent year with full spending statistics available.

Nationwide there was small progress in every category except for pavement condition on rural arterial roads. These improvements were achieved at a time when per-mile expenditures dropped slightly. Despite receiving stimulus funding from the federal government in 2009, spending on state roads decreased slightly, by 0.6%, in 2009 compared to 2008.

“It’s hard to believe it when you hit a pothole or see a bridge in Washington collapse, but the nation’s roads have been getting better,” said David Hartgen, author of the study and emeritus transportation professor at the University of North Carolina at Charlotte. “There are still several states struggling and plenty of problem areas but progress continues to be made.

Among the states plagued with problems are New Jersey and California. New Jersey spends $1.2 million per mile on its state-controlled roads. That’s nearly twice as much as the $679,000 per mile that the next biggest spending state—California—spends. North Carolina, home to the nation’s largest state highway system, spends $44,000 per mile on its roads. South Carolina spends just $31,000, the lowest per mile rate in the nation, according to a Reason Foundation study of all 50 state-controlled road systems.

Drivers in California and New Jersey may be wondering what they are getting in return for that money. More than 16 percent of urban Interstate pavement in each of those states is in poor condition. Only Hawaii ranks worse, with 27 percent of its urban Interstate pavement rated as poor.

Not only are California’s Interstates full of potholes, they are also jammed —smog.p0416.per.jpg80 percent of the state’s urban Interstates are congested. Minnesota has the next highest percentage of gridlocked Interstates, with 78 percent of urban Interstates deemed congested.

In terms of overall road conditions and cost-effectiveness, North Dakota has the country’s top ranked state-controlled road system, followed by Kansas (2nd), Wyoming (3rd), New Mexico (4th) and Montana (5th), according to Reason Foundation’s Annual Highway Report.

Alaska’s state-controlled road system is the lowest quality and least cost-effective in the nation. Rhode Island (49th), Hawaii (48th), California (47th), New Jersey (46th) and New York (45th) also perform poorly.

Vermont’s roads showed the most improvement in the nation, improving from 42nd in the previous report to 28th in the new overall rankings. New Hampshire (27th) and Washington (24th) both improved nine spots in the rankings.

Minnesota system plummeted 17 spots in the rankings, from 25th to 42nd and Delaware dropped nine spots to 20th.

Massachusetts had the lowest traffic fatality rate, while Montana had the highest.

Here is the Reason Foundation’s ranking for all 50 states:

1. North Dakota

2. Kansas

3. Wyoming

4. New Mexico

5. Montana

6. Nebraska

7. South Carolina

8. Missouri

9. South Dakota

10. Mississippi

11. Texas

12. Georgia

13. Oregon

14. Kentucky

15. Virginia

16. Nevada

17. Idaho

18. New Hampshire

19. North Carolina

20. Delaware

21. Tennessee

22. Indiana

23. Arizona

24. Washington

25. Ohio

26. Utah

27. Alabama

28. Vermont

29. Maine

30. Michigan

31. Wisconsin

32. West Virginia

33. Iowa

34. Illinois

35. Louisiana

36. Arkansas

37. Florida

38. Oklahoma

39. Pennsylvania

40. Maryland

41. Colorado

42. Minnesota

43. Massachusetts

44. Connecticut

45. New York

46. New Jersey

47. California

48. Hawaii

49. Rhode Island

50. Alaska

I can’t speak for all 49 states, but I can comment on a few of the reasons California’s roads have gotten so bad over the past few decades.

Bloated Caltrans civil service workforce.

It is estimated that Caltrans employs about 23,000 full-time civil service employees. this includes engineers, surveyors, mappers, maintenance workers, administrators, and clerical staff. Unlike other highway departments across the country Caltrans outsources less than 10% of its work to the private sector. Other states outsource between 30% to 70% of their engineering and maintenance services to the private sector on a competitive basis. This means that even when there is a reduced workload there is no reduction in Caltrans’ staff. This bloated staff is due to the political power of the public service unions in California, namely the Professional Engineers in California Government (PECG). This union dictates how much of Caltrans’ work is outsourced. This causes inefficiencies in balancing the work load and creates a larger demand for future pension liabilities

Increasing costs of health care for retired Caltrans employees.

Today about one-third of the money Caltrans collects from gas taxes and other motor vehicle fees are paid out to retirees for health care. Even with the highest gas taxes in the nation Caltrans is getting less money for maintenance of California’s roads and bridges and less and less money that should be reimbursed to local counties and cities for the maintenance of local streets. Also there has been very little new construction financed by the state. Most of the new construction is financed by counties through voter-approved sales tax measures.

The state raiding into the highway trust fund.

Until recently due to a voter approved initiative forbidding the state of California to raid the highway trust fund for the purpose of bolstering the general fund the state used money intended for maintenance of roads and bridges to be used to support the giant social welfare programs in California. After the passage of the initiative this was no longer allowed, but the state can still “borrow” highway money at the discretion of the Democrat controlled legislature. No matter how you cut it these highway funds do not end up maintaining the state’s roads and bridges.

In 50 years of mismanagement and union control the State of California has gone from no.1 in highway construction and management to no. 47.

Tuesday, July 23, 2013

It Finally Happened

“It is hard to imagine a more stupid or more dangerous way of making decisions than by putting those decisions in the hands of people who pay no price for being wrong.” — Thomas Sowell

Before I begin this blog I want to share a video that was done by Steven Crowder of PJTV in December of 2009. In the video Crowder takes you on a tour of the motor city and shows what has and is happening to the once great manufacturing center of the world.

And there is another video from the Reason Foundation address the issues causing the demise of Detroit.

In my search of YouTube videos about Detroit I found several hundred that would have be suitable for this article, but you can do that on your own by simply typing “Detroit in Ruins” in the search field.

In December 2010 I posted an article about the “Vanishing Detroit” in which I wrote about the history and potential demise of the motor city. In the concluding paragraphs of the article I state:

“This is a condition not limited to Detroit. Cities such as Oakland, St. Louis, Cleveland, and many others are approaching the same precipice of economic bankruptcy. With the massive costs for welfare and social services, shrinking tax base, poor schools, unfunded liabilities for public service workers pensions, teachers unions with the protection of underperforming teachers and increasing demands for higher wages and guaranteed pensions and a political class that panders for votes we are approaching a time in our history when cities are beginning to fail.

Until now cities have been relying on funds from state and the federal government to bails them out of their financial woes. With states experiencing the same malaise and the rising deficits of the federal budgets money for these cities are no longer going to be available. Perhaps the time has come for these cities to realize the mess they are in and declare bankruptcy rewrite their public service and teacher union contracts and tighten their belts in all areas of spending so they can survive. No more promises, no more pandering to special interest groups and no more fountains and stadiums unless they are totally financed with private money.”

Most rational economists and rational thinking people have been predicting the demise and eventual bankruptcy of Detroit for years. Now it has become official and no amount of state or, God forbid, federal funds can solve the problem.

Last week Governor Rick Snyder filed for Chapter 9 bankruptcy for the city of Detroit. The once leader of American industry has now joined the junk heap as a third world city. Chapter 9, Title 11 of the United States Code is a chapter of the United States Bankruptcy Code, available exclusively to municipalities that assists them in the restructuring of debts..

Why did this happen and will it happen to other American cities?

Michigan Gov. Rick Snyder and the bankruptcy specialist he appointed to fix Detroit’s1019-Rick-Snyder-ads.JPG_full_600 unprecedented financial problems put the blame Sunday squarely on the city and defended their decision to file for Chapter 9.

The Republican governor said Detroit created the problems and stood steadfast behind his decision to file Thursday for bankruptcy, with the city roughly $19 billion in debt.

“This is a tragic, difficult decision, but a right one,” he told CBS' "Face the Nation." “It’s not about just more money, it’s about accountable government.”

He said corruption and city leaders ignoring warning signs for 60 years contributed to the problems. Among his biggest concerns, Snyder said, is the decline of municipal services for Detroit’s remaining 700,000 residents, including police response times of nearly one hour.

Snyder said the state cannot help and asking for a federal bailout is “not the right answer,” though Washington has that option.

The Obama administration has extended no offer to help, after Congress and the White House agreed to bail out Chrysler and General Motors during the recent recession.

“Can we help Detroit? We don’t know,” Vice President Joe Biden said last week. His remarks followed White House Press Secretary Jay Carney appearing to rule out such assistance.

“That's something that local leaders and creditors are going to have to resolve,” he said. “But we will be partners in an effort to assist the city and the state as they move forward.”

Among the emerging concerns is that the federal government would have to help repeatedly, considering Chicago reportedly has an unfunded pension liability of at least $19 billion while Los Angeles’ is estimate to be as much as $30 billion.

The bankruptcy filing for Detroit marks a final step in the chrome-plated city’s decades-long decline — which started with the country’s overall manufacturing slowdown and continued with the departure of U.S. automakers and residents, leaving behind a sprawling city trying to survive on dwindling coffers.

Detroit was in the 1950s a worldwide hub of auto manufacturing, making it the fourth-largest U.S. city with one of the country’s highest per-capita incomes.

However, the so-called Motor City’s decline started soon after with residents — following their counterparts in other U.S. cities — starting to move to the suburbs and take with them businesses, jobs and tax dollars.

Historians argue the deadly 1967 riot in Detroit, one of the many so-called “race riots” across the country in the 1960s, accelerated the trend.

And as the population dwindled from roughly 1.8 million to 700,000, city officials struggled to keep up with municipal services in the 142-square-mile city, with a tax base just half of what it was in the 1950s.

Meanwhile, auto companies began opening plants in other cities as Japan-made cars dominated the international market. By 2009, the U.S. auto industry collapsed with the entire economy, eventually pulling down Detroit with it. When the UAW demanded high wages and more benefits the auto companies began moving to right to work states in the south so they could better compete with the Japanese car companies that were manufacturing cars and trucks there. As this happened the unions got what they wanted, but the jobs began to vanish and with that the tax base declined.

The city’s efforts to provide and maintain such basic services as law enforcement andDetroit Then And Now Photo Gallery trash removal were further complicated by the costs of paying union contracts and benefits, which have contributed to nearly $15 billion in unfunded liabilities for the city.

Once again these public service unions got the raises and pensions they demanded and the Democrats gave into their demands to get their financial support and their votes but the city did not have the money to fund these liabilities.

In addition, Detroit has a roughly 18 percent unemployment rate, one of the country’s highest violent-crime rates and about 80,000 blighted or abandon buildings.

“Chronic budget problems have taken a significant toll on everyday life for citizens,” Snyder said recently. “Detroiters deserve to feel safe when they walk down the street, to have their street lights on, to have the bus show up to take them to work.”

However, the city also has a history of corruption that has led to its financial problems, including Mayor Kwame Kilpatrick resigning in a 2008 sex-and-perjury scandal that cost the city almost $9 million from a lawsuit and legal fees.

Years of Democratic Party rule, corruption, escalating social welfare programs, failing public schools, high taxes, demands of the teachers and public service unions, racial tensions, gangs, and a rising crime rate have finally taken heir toll on Detroit.

The recent bankruptcy filing in Detroit is raising red flags about other major U.S. cities also dealing with billions in under-funded retiree benefits, prompting the question — who might be next?

Just last week, Chicago’s credit rating was downgraded as a result of its $19 billion in under-funded pension liabilities.

Moody's Investors Service called the liabilities “very large and growing" and warned that Chicago, the country’s third-largest city, faces a “tremendous strain’’ in trying to meet future funding requirements and public safety demands.

A similar scenario, though decades in the making, largely doomed Detroit, whose average police response time has grown to more than 50 minutes.

And like Michigan, which appears in no position to bail out Detroit, Illinois is dealing with its own $97 billion pension shortfall.

To be sure, other smaller cities have filed for bankruptcy, most notably California’s Stockton and San Bernardino in 2012. No other city of Detroit's size appears to be on the cusp of imminent financial collapse.

However, those bankruptcy filings together have resulted in speculation about whether more are on the horizon

Other cities now on the radar include Cincinnati, Minneapolis, Portland, Ore., and Santa Fe, N.M. — following Moody’s saying in April that they and 11 other municipalities were being reviewed for a possible credit downgrade, the result of a new analysis system that further considers pension liabilities.

Though much of the national concerns have focused on pension liabilities, heath care costs for retired municipal employees pose an equally if not larger problem.

Amid the $18.5 billion in long-term debt that led Detroit to file for bankruptcy is roughly $3.5 billion in under-funded pension liabilities. However, roughly $5.7 billion of that debt is health care costs and so-called “other post-employment benefits.”

The situation is highlighted a Pew Charitable Trusts Study of 61 major U.S. cities that found they collectively had enough money to cover 74 percent of pension liabilities but only 6 percent of health care liabilities.

The total difference between what the cities owed to retired employees and what was covered equaled $217.2 billion, according the report, “A Widening Gap in Cities.” It was released in January and based on 2009 numbers, the most complete data at the time.

The nonprofit group also released a report in March that found New York City has a combined $1.15 billion in under-funded pension and health-care costs, followed by such major cities as Philadelphia, at $8.6 billion. In comparison, that figure for Detroit was $12.9 billion.

The video clip shown here is from PJTV and the three commentators summarize the reasons Detroit and other cities will continue to fail.

As our nation continues down the road of higher taxes, more regulations, and runaway spending by politicians only interested in the next election more cities will fail. Just wait until 30 million illegal immigrants are added in the equation.

Today we have 47 million people on food stamps. That’s 15% of the population. Even college students are receiving food stamps today.

Rather than use the meager funds available to cities and states for big union contracts, luxury projects like light rail, and promoting more welfare programs they need to pay attention to the basic municipal functions of police and fire services, garbage collection, repairing crumbling sewer lines, streets, and bridges — the things people pay property taxes for.

Since the early days of the Republic, America’s cities have been centers of innovation, wealth, and power. As they grew larger and their governments more commanding, places like Boston, Chicago, Newark, New York, Philadelphia, and St. Louis also became battlegrounds where political machines contended for influence. The early ideal of the part-time citizen-legislator gave way to the professional pol. In his 1904 “The Shame of the Cities”, Lincoln Steffens observed that big-city governments across America had been undermined by a series of problems, including police corruption, politicians using the public till for their own gain, and rampant bribery in awarding public contracts, known at the time as “boodle.”

The Democratic Party is a party of special interest groups, or “factions” as James Madison called them. There are racial groups, LGBT groups, unions (both private and public sector), teachers unions, environmentalists, and pro-abortion advocates. All of these groups want something and the Democratic Party is who they turn to for it. They want plunder and the Democrats will give it to them as long as it brings them votes. They don’t care about the future. They only care about the next election and how to retain their power.

Decades of corruption built a mountain of liabilities, while scaring off the taxpayers needed to finance those promises. It’s like a movie trailer for the blockbuster disaster film to come, when America’s declining demographics catch up with the federal government’s vastly higher mountain of unfunded commitments. Detroit is the city our debt monster destroyed to get limbered up for the greater fiscal carnage to come.

Death spirals spin even faster when it’s possible for productive workers to escape. Thedetroitbt12_20130723_030548 population implosion in Detroit was swifter and more dramatic than our national workforce collapse, because it was relatively easy for citizens to escape the degenerate loop of declining municipal services and rising taxes but in the long run, the result will be the same. There are people capable of fleeing the United States entirely, when our moment of truth arrives. Their departure will be a good sign that the Great Crash is at hand. The loss of their capital and business acumen will hasten our collapse.

We should stop the death spiral before things get bad enough for the smart money to take a powder. Of course, there were people in Detroit who said the same thing, twenty or thirty years ago. They were drowned out by a perpetual-motion political machine, which promised the good times would keep rolling forever. Even now, frantic liberals are gibbering that Republican austerity measures somehow killed Detroit, even though Democrats held absolute power for fifty years. You’ll hear the same things right before the end at the national level too. In the very near future, you’ll be told your Social Security and Medicare benefits are being cut because evil rich people don’t want to pay enough taxes to fund them. It won’t matter that there literally isn’t enough money in the entire world to cover Uncle Sam’s long-term liabilities. Anger and resentment will be milked for power until the very end. Those who do the milking will soar away from the wreckage with millions of dollars in their pockets.

Pension and benefit liabilities are really just a concentrated form of the same toxin eating away at every level of government: deficit spending. They’re just another way to spend tomorrow’s money, which is easy, because tomorrow casts very few votes in today’s elections. The people who fret over “sustainable” development at environmentalist conferences are nowhere to be found when it’s time to discuss sustainable government. Forward-thinking “progressives” are perfectly happy to be ruled by the dead hand of past entitlement promises. Those who regard the U.S. Constitution as a dead scrap of old parchment think union benefit plans are chiseled on tablets of stone.

Here’s a trick question for you: What does the government buy with its billions in deficitDetroit money? The correct answer is: commitments. Very little of that crazy deficit spending is a one-time outlay, evaporating without trace in the next fiscal year. Governments use money they don’t have to rack up long-term spending commitments, which quickly acquire human faces. Cut a million in spending, and you’ll be putting this government employee out of work, or trimming back a program that person depends on for their livelihood. Lay a finger on the pension plans of Detroit, and you’ll outrage people who are counting on those payments to finance their lengthy retirements. Promises were made. Reform is betrayal. You’ll never see a more motivated group of voters than people who believe their well-earned benefits are at risk.

Maybe the people who made all those unsustainable promises should have thought about the grim day when it would become impossible to keep them. Perhaps the outraged beneficiaries should direct their ire at the people who bought their support by making commitments that can no longer be fulfilled. But it doesn’t work that way. The people who made the unsustainable commitments are long gone. Criticizing them is living in the past. All that’s left to discuss is how today’s young people will be indentured to pay off bills they never had a chance to vote against. Fate is written one borrowed dollar at a time, and the “progressives” tell us it cannot be unwritten. We surrender control of our fate whenever we allow the government to spend money it doesn’t have. We leave our children with a hope chest full of chains.

Liberals pretend that debt is only a concern when they want to talk about tax increases. And even then, it’s not that big of a concern. They’re not interested in balancing the budget, much less paying off the mountain of debt already incurred. Skeptics are told there’s no reason to worry, we’ll always be able to borrow more money. And then the day arrives that we can’t. It happens fast. The final promises of unlimited government credit are still ringing in our ears. Contrary to the promises of charlatans, government debt is not an abstract number floating on some spreadsheet. Money cannot be printed forever. There comes a moment that the cost of financing debt abruptly explodes, and suddenly the government’s financial commitments balloon by 30 percent, 50 percent, or more. Draconian tax increases are presented as the only possible solution. The geese that lay our golden eggs are duly strangled. And then what? It’s funny how quickly political rhetoric can shift from bright futures of unlimited possibility, to grim demands for the cash needed to fulfill ironclad entitlement commitments.

Private corporations and unions make unsustainable problems too, but at some point0722-Business-Detroit_full_600 unsupportable demands will kill off the host organism. The company and its unions collapse together, leaving others to pick up the pieces and devise a more workable business plan. That’s what happened with the Twinkie — it’s back on store shelves following a cycle of creative destruction. But that’s not what happened with Big Auto or Detroit, is it? When the operation reaches a certain size, we’re told it can’t be allowed to undergo the cleansing cycle of death and rebirth which means suddenly it’s everyone’s problem.

As goes Detroit, so goes America. The steering wheel is lashed in place, a cement block has been dropped on the gas pedal, the emergency exits are welded shut, and nervous passengers are told to swallow their complaints. The commitments that were so very easy to make yesterday will become impossible to fulfill tomorrow. The range of options available to deal with fiscal crisis will be dramatically restricted, as every strategy to increase economic growth is pronounced unthinkable. How much flexibility does Detroit have to win investors, and attract productive labor back to the city? How much flexibility will Barack Obama’s successor have to restart the American economy? Promises become curses, then wither away into epitaphs.

For more photos of crumbling Detroit please click here.

As Stephen D. Eide, a senior fellow at the Manhattan Institute’s Center for State and Local Leadership, writes in the Daily Beast:

“However long it takes, bankruptcy will cut Detroit’s debt, but that’s a necessary, not sufficient condition of any revitalization. On its own, bankruptcy can’t reform city government, reduce unemployment, bring down the crime rate, or reverse depopulation. Eventually, Kevyn Orr will exit the stage, and leave those challenges for Detroit’s citizens and public officials to resolve. In the near-term, the task for Detroit city government is usefully simple: bring down the debt. If progress is made on other fronts along the way, private sector actors will most likely be responsible. Government was not the only cause of Detroit’s decline, and will play, at most, a supporting role in the city’s revival.”

Saturday, May 25, 2013

The Myth of Quality from Government Services

“Almost all quality improvement comes via simplification of design, manufacturing layout, processes, and procedures.” — Tom Peters

On May 21, 2013 Secretary of Veterans Affairs Eric Shinseki issued a press release addressing the problems with the VA and setting metrics for improvement:

“VA and Veterans Service Organizations Announce Claims Initiative to Reduce Claims Backlog - Today, the Department of Veterans Affairs (VA), Disabled American Veterans (DAV), and The American Legion announced a new partnership to help reduce the compensation claims backlog for Veterans. The effort—the Fully Developed Claims (FDC) Community of Practice—is a key part of VA’s overall transformation plan to end the backlog in 2015 and process claims within 125 days at 98% accuracy. VA can process FDCs in half the time it takes for a traditionally filed claim.”

In a related report by Aaron Glantz of the Riverside Press-Enterprise:

“The Department of Veterans Affairs has systematically missed nearly all of its internal benchmarks for reducing a hulking backlog of benefits claims and has quietly backed away from repeated promises to give all veterans and family members speedier decisions by 2015.

Internal VA documents, obtained by the Center for Investigative Reporting, show the agency processed 260,000 fewer claims than it thought it would during the past year and a half – falling 130,000 short in fiscal 2012 and another 130,000 short of its goal between October and March.

The result: At a time when the number of veterans facing long waits was supposed to be going down, it instead went up.

On April 29, the VA began to qualify its promise, made repeatedly since 2009, that “all claims” would be processed within four months by 2015.

In a weekly performance report posted on its website, the agency excludes a host of benefits from the promise – including veterans’ burial subsidies, pensions sought by survivors and compensation claims from children of Vietnam veterans, who have birth defects caused by the defoliant Agent Orange.

In an emailed statement, the VA said its promise to eliminate the claims backlog was never meant to cover those types of benefits.

The agency also said it is “using all the tools in the toolbox” to expedite claims. It again repeated its mantra that the delays are “unacceptable.” It added that it fell nearly 17,000 claims short of its production goal for April.

But the VA did not address questions about the fundamental issue: Are the goals unrealistic, the execution flawed or both?

Instead, the agency cited yet another set of ambitious goals – an April vow to clear all 2-year-old claims by mid-June and an order, issued May 15 by VA Secretary Eric Shinseki, instructing all claims staff to work 20 hours of overtime a month through September, which the agency said would have “a measurable impact by the end of the fiscal year.”

The long delays and seemingly intractable nature of the claims backlog has led some lawmakers to look into radically overhauling the process.

…

Earlier this month, Rep. Bill Enyart, an Illinois Democrat and former adjutant general of the Illinois National Guard, introduced legislation to require the VA to begin providing partial compensation to all veterans with claims pending more than 125 days – even if their disabilities had not yet been verified. If a claim denial ultimately followed, veterans would have to pay back the money only if they were found to have consciously misled the agency.

Minnesota Democrat Al Franken has introduced a similar measure in the Senate.

“I’m tired of meeting veterans who come back from Iraq and Afghanistan, who can’t work because they are disabled and are worried about losing their home,” Enyart said. “They deserve better than that.”

According to USA Today the VA has seen its budget increase 41% since 2009 to $140 billion this year. Meanwhile, the pace of incoming disability claims has stayed ahead of VA's ability to process them:

“Concerned about nearly 600,000 veterans waiting months or years for disability checks, Obama administration officials Friday lifted the veil on a corner of the president's upcoming 2014 budget, promising a hike in VA discretionary spending.

The proposal would boost non-entitlement spending to $63.5 billion for 2014, a 4% increase over this year, said Department of Veterans Affairs Secretary Eric Shinseki and White House chief of staff Denis McDonough in a meeting with reporters at the Executive Office Building.

"We're bringing all the power of the government to bear ... to try to address the backlog," says McDonough, who added that Obama tracks the weekly numbers of pending cases. "We're involved in this ... on a daily basis, very aggressively to try to bring this (disability claims backlog) number down."

Shinseki in recent weeks has come under intense criticism for the backlog from a chorus ranging from comedian Jon Stewart to the House VA Committee chair, who called upon the department's Veterans Benefits Administration chief to resign because of it.

"I hear the criticism out there," Shinseki said Friday. "You make the tough decisions, and you deal with it."

McDonough seemed to reaffirm the White House's confidence in Shinseki, saying he is someone "the president relies on and leans on daily."

The VA has seen its budget increase 41% since 2009 to $140 billion this year. Meanwhile, the pace of incoming disability claims has stayed ahead of VA's ability to process them, and there are now nearly 900,000 pending claims from veterans, including about 600,000 waiting longer than four months.

McDonough stressed the administration's high priority on VA spending even as major reductions are considered elsewhere, citing news reports Friday that Obama would propose cutbacks in Social Security and Medicare.”

I also heard an audio clip from an interview with Shinseki today where he restated his goals for the VA and added that they were targeting a rating of 90% for customer service. When I heard this I almost drove the car off the road. I was flabbergasted by such a statement! This was just more big government BS. What about the 10%? I guess they are irrelevant. How about the 98% accuracy goal? Does this mean that 18,000 (2%) vets will have inaccurate medical and benefit records? They deserve much better than that.

In the late 1980s the civil engineering, land surveying, and environmental services I was a principle, part owner and vice-president of made an application to the committee overseeing the prestigious Malcolm Baldrige National Quality Award. This is a very difficult award to receive and the firm was fortunate to make the top 100 national list.

The Baldrige Criteria for Performance Excellence serve two main purposes: (1) to identify Baldrige Award recipients that will serve as role models for other organizations and (2) to help organizations assess their improvement efforts, diagnose their overall performance management system, and identify their strengths and opportunities for improvement. In addition, the Criteria help strengthen U.S. competitiveness by:

  • Improving organizational performance practices, capabilities, and results
  • Facilitating communication and sharing of information on best practices among U.S. organizations of all types
  • Serving as a tool for understanding and managing performance and for guiding planning and opportunities for learning

The Baldrige Criteria for Performance Excellence provide organizations with an integrated approach to performance management that results in:

  • Delivery of ever-improving value to customers and stakeholders, contributing to organizational sustainability
  • Improved organizational effectiveness and capabilities
  • Organizational and personal learning

During our award submittal process I had read an article about a Cadillac Dealership in Dallas, Texas that had received the award for excellence. During the award ceremony with the assembled dealership employees and their families when the Baldrige Committee representative he stated that he dealership had one of the highest customer service ratings in the nation at 98.5%. This brought a round of cheers and applause from the audience. The owner of the dealership stepped up to the podium to thank the committee and the employees Then he became very serious and stated he was not satisfied with 98.5%. He said there were 1.5% of his customers who were not satisfied with the performance of the dealership and he was very concerned with them and admonished his employees that he expected them to do better in the coming years. This was a serious and dedicated man to his customers.

One of my responsibilities during my 22 years as a manager and owner I was very involved in quality control and quality assurance. The three books that I kept above my desk were: In Search of Excellence by Tom Peters and Robert H. Waterman; The Peter Principle by Laurence J. Peter and Raymond Hull; and Out of Crisis by W. Edwards Deming. These three books could be considered my quality assurance and customer service bibles.

In Search of Excellence is considered the "Greatest Business Book of All Time" (Bloomsbury UK), and has long been a must-have for the boardroom, business school, and bedside table.

Based on a study of forty-three of America's best-run companies from a diverse array of business sectors, In Search of Excellence describes eight basic principles of management — action-stimulating, people-oriented, profit-maximizing practices — that made these organizations successful.

In Search of Excellence', co-authored with Bob Waterman, is Tom Peters first book and sold over 6 million copies. Its success surprised their colleagues at McKinsey, who had laughed at the idea that Peters and Waterman would keep the royalties, "should the book sell 50 000 copies".

Two decades later, In Search of Excellence is still one of the most readable management books. The eight characteristics of excellent companies, a bias for action, close to the customer, autonomy and entrepreneurship, productivity through people, hands-on values driven, stick to the knitting, simple form and lean staff, simultaneous loose-tight properties are all still relevant and still ignored today. It is written clearly, painting vivid pictures with anecdotes and examples from real companies.

Peters and Waterman found eight common themes which they argued were responsible for the success of the chosen corporations. The book devotes one chapter to each theme.

  1. A bias for action, active decision making — getting on with it. Facilitate quick decision making & problem solving tends to avoid bureaucratic control
  2. Close to the customer — learning from the people served by the business.
  3. Autonomy and entrepreneurship — fostering innovation and nurturing champions.
  4. Productivity through people — treating rank and file employees as a source of quality.
  5. Hands-on, value-driven — management philosophy that guides everyday practice - management showing its commitment.
  6. Stick to the knitting — stay with the business that you know.
  7. Simple form, lean staff — some of the best companies have minimal HQ staff.
  8. Simultaneous loose-tight properties — autonomy in shop-floor activities plus centralized values.

None of these themes are present in the government civil service. I know because I worked as a supervisor for the California Division of Highways (now Caltrans) for ten years prior to going into business for myself. The civil service is managed by bureaucrats who are far more concerned with advancement in their civil service rating (GS rating for the federal government) and maintaining their longevity until their lucrative retirement benefits. It is a punitive system of management where “don’t rock the boat” far outweighs “thinking out of the box” and taking responsibility. Employees are managed and governed by policy manuals and memorandums and are far removed from their upper management. Customer (taxpayer) service ranks last on the list of concerns — personal advancement tops the list.

The main theme of The Peter Principle is rising to the level of incompetency. Back in 1969, Lawrence J. Peter created a cultural phenomenon with his brilliant, outrageous, hilarious, and all-too-true treatise on business and life, The Peter Principle — and his words and theories are as true today as they were then. By posing — and answering — the eternal question, “Why do things always go wrong?” Peter explores the incompetence that runs so rampant through our society, our workplace, and our world in an outrageously funny yet honest and eye-opening manner

The Peter Principle is a proposition that states that the members of an organization where promotion is based on achievement, success, and merit, will eventually be promoted beyond their level of ability. The principle is commonly phrased, "Employees tend to rise to their level of incompetence." In more formal parlance, the effect could be stated as: employees tend to be given more authority until they cannot continue to work competently.

The principle holds that in a hierarchy, members are promoted so long as they work competently. Eventually they are promoted to a position at which they are no longer competent (their "level of incompetence"), and there they remain, being unable to earn further promotions. Peter's Corollary states that:

In time, every post tends to be occupied by an employee who is incompetent to carry out its duties"

Ads that "work is accomplished by those employees who have not yet reached their level of incompetence." "Managing upward" is the concept of a subordinate finding ways to subtly manipulate his or her superiors in order to prevent them from interfering with the subordinate's productive activity or to generally limit the damage done by the superiors' incompetence.

Another method is to refrain from promoting a worker until he or she shows the skills and work habits needed to succeed at the next higher job. Thus, a worker is not promoted to managing others if they do not already display management abilities.

The first corollary is that employees who are dedicated to their current jobs should not be promoted for their competence, but should instead be rewarded with, say, a pay rise, and remain in their current position; they should also not be promoted in response to their lack of competence at their current job.

The second corollary is that employees might be promoted only after being sufficiently trained to the new position. This places the burden of discovering individuals with poor managerial capabilities before (as opposed to after) they are promoted.

As a manger I saw this numerous times within the organization. We would have project engineers who were crackerjacks at their job. They were technical competent, if not superior, they loved their work, and were constantly striving for excellence in engineering. But when they were promoted to the level of project manager where they had to deal with subordinates and more importantly clients and contract issues many would fail and would ether resign or asked to leave. Their client service skills were weak, if not nil, due to the introverted nature of an engineer. They were more comfortable with the computer than the telephone of a face-to-face client meeting. This was unfair to a technically sound and dedicated employee. It would have been far better to reward his or her performance with monetary and educational perks.

This also applies to the civil service. Promotions come via civil service exams and longevity. If a GS 9 studies and keeps his or her nose clean they will eventually be promoted to GS 10 and so on and on until they reach their level of incompetence and sit there until retirement. If you doubt this just look at the current spate of hearings regarding the maleficence and criminal behavior of the IRS and Justice Department.

In the late 1980s I was introduced to the work of W. Edwards Deming through his book Out of Crisis. was an American statistician, professor, author, lecturer and consultant. He is perhaps best known for the "Plan-Do-Check-Act" cycle popularly named after him. In Japan, from 1950 onwards, he taught top management how to improve design (and thus service), product quality, testing, and sales (the last through global markets) through various methods, including the application of statistical methods.

Deming made a significant contribution to Japan's later reputation for innovative high-quality products and its economic power. He is regarded as having had more impact upon Japanese manufacturing and business than any other individual not of Japanese heritage. Despite being considered something of a hero in Japan, he was only just beginning to win widespread recognition in the U.S. at the time of his death. President Reagan awarded the National Medal of Technology to Deming in 1987. He received in 1988 the Distinguished Career in Science award from the National Academy of Sciences.

Deming's teachings and philosophy are best illustrated by examining the results they produced after they were adopted by Japanese industry, as the following exampleimage_theman shows: Ford Motor Company was simultaneously manufacturing a car model with transmissions made in Japan and the United States. Soon after the car model was on the market, Ford customers were requesting the model with Japanese transmission over the US-made transmission, and they were willing to wait for the Japanese model. As both transmissions were made to the same specifications, Ford engineers could not understand the customer preference for the model with Japanese transmission. Finally, Ford engineers decided to take apart the two different transmissions. The American-made car parts were all within specified tolerance levels. On the other hand, the Japanese car parts were virtually identical to each other, and much closer to the nominal values for the parts – e.g., if a part was supposed to be one foot long, plus or minus 1/8 of an inch – then the Japanese parts were all within 1/16 of an inch. This made the Japanese cars run more smoothly and customers experienced fewer problems.

My cousin worked for Ford Motors at the Cleveland Engine plant for 25 years as a general foreman. In the late 1980s he told me, while on a visit to Cleveland, that his plant had a very high rejection rate of cast engine blocks. He claimed this was due to union work rules and the company’s lack of willingness to challenge the union for fear of work slow-downs or strikes. He told me that Japanese auto manufactures, even the non-union shops in the United States, were delivering cars of higher quality and dependability. The Japanese, adhering to principles espoused by Deming were even surpassing the Germans in quality.

Deming offered fourteen key principles to managers for transforming business effectiveness. The points were first presented in his book Out of the Crisis. Although Deming does not use the term in his book, it is credited with launching the Total Quality Management (TQM) movement.

  1. Create constancy of purpose toward improvement of product and service, with the aim to become competitive, stay in business and to provide jobs.
  2. Adopt the new philosophy. We are in a new economic age. Western management must awaken to the challenge, must learn their responsibilities, and take on leadership for change.
  3. Cease dependence on inspection to achieve quality. Eliminate the need for massive inspection by building quality into the product in the first place.
  4. End the practice of awarding business on the basis of a price tag. Instead, minimize total cost. Move towards a single supplier for any one item, on a long-term relationship of loyalty and trust.
  5. Improve constantly and forever the system of production and service, to improve quality and productivity, and thus constantly decrease costs.
  6. Institute training on the job.
  7. Institute leadership. The aim of supervision should be to help people and machines and gadgets do a better job. Supervision of management is in need of overhaul, as well as supervision of production workers.
  8. Drive out fear, so that everyone may work effectively for the company.
  9. Break down barriers between departments. People in research, design, sales, and production must work as a team, in order to foresee problems of production and usage that may be encountered with the product or service.
  10. Eliminate slogans, exhortations, and targets for the work force asking for zero defects and new levels of productivity. Such exhortations only create adversarial relationships, as the bulk of the causes of low quality and low productivity belong to the system and thus lie beyond the power of the work force.
  11. a. Eliminate work standards (quotas) on the factory floor. Substitute with leadership. b. Eliminate management by objective. Eliminate management by numbers and numerical goals. Instead substitute with leadership.
  12. a. Remove barriers that rob the hourly worker of his right to pride of workmanship. The responsibility of supervisors must be changed from sheer numbers to quality. b Remove barriers that rob people in management and in engineering of their right to pride of workmanship. This means, inter alia, abolishment of the annual or merit rating and of management by objectives.
  13. Institute a vigorous program of education and self-improvement.
  14. Put everybody in the company to work to accomplish the transformation. The transformation is everybody's job.

"Massive training is required to instill the courage to break with tradition. Every activity and every job is a part of the process."

Seven Deadly Diseases

The "Seven Deadly Diseases" include:

  1. Lack of constancy of purpose
  2. Emphasis on short-term profits
  3. Evaluation by performance, merit rating, or annual review of performance
  4. Mobility of management
  5. Running a company on visible figures alone
  6. Excessive medical costs
  7. Excessive costs of warranty, fueled by lawyers who work for contingency fees

A Lesser Category of Obstacles" includes:

  1. Neglecting long-range planning
  2. Relying on technology to solve problems
  3. Seeking examples to follow rather than developing solutions
  4. Excuses, such as "our problems are different"
  5. Obsolescence in school that management skill can be taught in classes
  6. Reliance on quality control departments rather than management, supervisors, managers of purchasing, and production workers
  7. Placing blame on workforces who are only responsible for 15% of mistakes where the system designed by management is responsible for 85% of the unintended consequences
  8. Relying on quality inspection rather than improving product quality

Deming's advocacy of the Plan-Do-Check-Act cycle, his 14 Points and Seven Deadly Diseases have had tremendous influence outside manufacturing and have been applied in other arenas, such as in the relatively new field of sales process engineering.

It was Deming’s principles and theories that put the issues of quality assurance, quality control, and client service in to total context for me. In 2006 I wrote a series of three articles for American Surveyor magazine where I stated:

“In 2003 the Mercedes Benz motorcar company had dropped from No.1 to 26th place on the J.D. Powers and Associates, Inc.* rating of auto manufacturers in the category of quality. This was eight slots below the industry average, trailing Chrysler and Ford. In 1991 Mercedes ranked No. 1 in quality and customer satisfaction; by 2000 they had dropped to No. 6 and by 2003 to 26th. Some of the problems cited in the J.D. Powers reports were handling, braking, shocks and struts, electronic window controls, and inaccurate fuel gauges. How did this one-time industry nameplate fall on such hard times?

The problems cited in the survey arose from three models from the year 2000, including the midsize E-Class sedan, Mercedes' big money maker. In the 1990s Toyota and Nissan stormed the U.S. market with lower-priced luxury cars such as the Lexus and Infiniti. To compete, Mercedes' engineers had to overhaul their process of building cars. Instead of letting design determine the cost, engineers had to design cars to meet a target price. These German engineers, accustomed to designing for quality, weren't very good at this practice. Quality took a back seat. Fortunately for Mercedes this situation did not last long and the company regrouped and went back to its roots, designing for quality and value.

Several years ago the firm I work for received a call from a Mercedes engineer in Stuttgart, Germany requesting that we take elevations on a section of the Harbor Freeway in Los Angeles. They wanted elevations taken to 3 millimeters on a ten-foot-by-ten-foot grid along a very rough section of this heavily traveled roadway. The Mercedes engineers wanted to use this data to create a digital terrain model of the roadway so they could design their front-end suspension for California drivers, many of which had been complaining about the stability and durability of the suspension systems. We carried out this assignment using the Vangarde 505 remote sensing pavement survey system. Due to the density of the grid, heavy traffic conditions requiring working off hours and nights, and coordinating with Caltrans, this was a very costly survey. It was also quite a change in philosophy from designing for cost rather than quality and customer satisfaction.”

…

“Both TQM and ISO 9000 (and its deviants) are very complex programs requiring a great deal of management's time and training throughout the enterprise. I will refrain from referring to these programs as in my opinion they do not address the focus of my articles. They are valuable programs and for many large private and public sector contracts the qualifying firms must demonstrate either ISO 9000 or a TQM certification. Keep in mind that both of these programs require external and internal audits of a company's business and client service practices, and run the gamut from accounting systems to answering the phone. ISO 9000 covers the basics of what quality management systems are and also contains the core language of the ISO 9000 series of standards. ISO 9001 is intended for use in any organization that designs, develops, manufactures, installs and/or services any product or provides any form of service. It provides a number of requirements which an organization needs to fulfill if it is to achieve customer satisfaction through consistent products and services that meet customer expectations.

All of these quality assurance programs are rooted in the teachings of W. Edwards Deming. Deming is to quality as Peter Drucker is to management (Management by Objectives) and Tom Peters (In Search of Excellence) is to client service.

William Edwards Deming (1900-1993) was an American statistician, widely credited with improving production in the United States during World War II. He is perhaps best known for his work in Japan, where from 1950 onward he taught top management the principles of Statistical process control (SPC), a forerunner of TQM. During the post-war reconstruction of Japan General Douglas MacArthur invited Deming to assist in the rebuilding of Japanese industry. At that time products made in Japan were considered to be of very low quality. Some Japanese cottage industries had located in the village of Usa so they could claim the their products were made in the USA! This did not help very much. When Japanese cars began arriving in the United States in 1960, Detroit automakers sneered. But we all know the end of the story. It is the Japanese and Korean automakers that are now building their cars in the "real" USA, and they are known for quality.

Under Deming's stewardship Japan became renowned for producing innovative high quality products. Deming is regarded as having had more impact upon Japanese manufacturing and business than any other non-Japanese individual.

Deming taught that by adopting appropriate principles of management, organizations can increase quality and simultaneously reduce costs (by reducing waste, rework, staff attrition and litigation while increasing loyalty) The key is to practice continual improvement and think of manufacturing as a system, not as bits and pieces. In 1960, Deming became the first American to receive the Second Order of the Sacred Treasures from Prime Minister Nobusuke Kishi. An accompanying citation stated that the people of Japan attributed the rebirth and success of their industry to his work. Today the highest prize awarded by the Japanese Union of Scientists and Engineers (JUSE) for industrial achievement is the Deming prize. This is comparable to the Malcolm Baldrige National Quality Award, established by the U.S. Congress in 1987 to recognize quality and business achievements of U.S. organizations.”

(These articles are available in a PDF format by click on the appropriate part of the series; Part 1, Part 2, and Part 3.)

I have given lectures at seminars for both the private and public sector of quality assurance, quality control, and client service. After my retirement I was contracted to write the quality assurance, quality control, and client service manual for my previous firm. It was the first interactive, hyperlinked manual of its kind the firm had ever had.

Of course I had to tailor my presentations to address the needs and concerns of the private and public sectors. This was difficult as the public sector, as stated above, is quite different from the private. To the private sector profit and sustainability are paramount and to achieve these firms are dependent on the highest quality, superb client service and retaining he best employees while keeping costs as low as possible. This is a very delicate balancing act, but Deming’s principles are most applicable.

In the public sector we have a different culture and management style. There is no realization of profit in the public sector. Why should there be? They have a unlimited source of capitalization — it’s called taxpayer money. Cost control is not an issue as most agencies are not aware of their real costs of doing business as they do not take into account the costs of employee productivity. They staff by available budget and each year they request budget increases. If they do not use their entire budget in any fiscal reporting period they lose the funds. This encourages them to spend until all the money is gone. There is no reward for saving money.

They have a punitive management style based on policies and memorandums that issue from some unknown mastermind in another department, building or state. Cross communication is something to be avoided as it only creates potential conflict.

I present all of this as an argument to show how the VA with its 41% increase in budget is still doing a lousy job and not meeting its goals and metrics.

This condition is not exclusive to the VA, but to almost every federal and state agency in the nation, including the military. They obfuscate with government doublespeak to a pint where the Congress and taxpayer is bamboozled over and over again. A recent example is the collapse of a bridge on I-5 over the Skagit River in the state of Washington. It did not take lone for the governor of Washington, Jay Inslee (D), to call for more money from the people of Washington and the federal government to repair and replace the ailing and failing transportation infrastructure. The New York Times reports:

“Mr. Inslee said in an interview that a broader message of the collapse is that state financing for state transportation projects — now under consideration in a special session of the Legislature — can no longer wait, especially for the long-delayed Columbia River project.

“It shouldn’t take an oversize load to let us know we have an oversized problem,” he said.

Washington State faces a deadline this year to find money for the $3.2 billion project over the Columbia River, or risk losing up to $1.2 billion in federal financing. Oregon’s Legislature has approved $450 million, but Washington State’s $450 million share has been stalled. About $1 billion would come from tolls.

Building America’s Future, an advocacy group founded by Mayor Michael R. Bloomberg of New York and two former governors, Edward G. Rendell of Pennsylvania and Arnold Schwarzenegger of California, also issued a statement characterizing the bridge collapse as a “call to action.”

“Regardless of how this happened, the collapse of the Skagit River Bridge in Washington State is a timely reminder of our nation’s need to invest in critical infrastructure upgrades,” Mr. Rendell said. “Our nation’s bridges, roads and highways are deteriorating before our eyes.”

Over the years the federal and state governments have collected excise taxes from the sale of gasoline, diesel fuel, tires, auto and truck registrations, and tolls to pay for the nation’s roads. Where does the money go? In states like Washington and California a large percentage of those excise go to bloated state employee staffs within the departments of transportation along with pensions and health care benefits for retiring state employees. Washington, as California, is restricted from outsourcing much of its design and maintenance programs to the private sector. Until these government union controlled agencies take a different course our infrastructure will continue to age and fail. Of course we can always take the train.

Tuesday, May 7, 2013

The Problem with the FAA and Sequestration

“The world runs on individuals pursuing their self-interests. The great achievements of civilization have not come from government bureaus. Einstein didn't construct his theory under order from a, from a bureaucrat. Henry Ford didn't revolutionize the automobile industry that way.” — Milton Friedman

As lines grew at airports and passengers began to fume, Congress lumbered into action, holding hearings on furloughs and sequestration, and, ultimately tweaking the law to allow the Federal Aviation Administration (FAA) to add more manpower at the nation’s air traffic control towers. The only silver lining to the whole calamity may be that some small part of the government actually had a real discussion about spending. Not that it solves the underlying problem or averts mounting complaints about flying. If Congress was serious about improving air travel, they would have moved forward with plans to modernize our aviation system with new technologies that would render many of the existing towers redundant and obsolete, while allowing private entrepreneurs to play a larger role in airport management.

Airlines were deregulated in 1978, saving consumers billions of dollars and opening air travel to a much larger public. But as anyone who has flown recently knows, air travel is far less enjoyable than it was in the days of regulation and pampered passengers. It’s not just the TSA security checks; airlines have restructured their routes to keep flights as full as possible while trimming back on amenities. And airport facilities lag far behind the growing demand for air travel. In short, air travel is a no frills experience that leaves many passengers dreading the trip to the airport.

A large part of the problem is that while airlines have been deregulated, airports remain mired in red tape and bureaucratic sclerosis that make expansion and modernization difficult. The FAA relies on antiquated technologies to regulate increasingly congested skies. An upgrade is sorely needed, and the technology exists to more accurately monitor planes in the sky with significantly fewer facilities on the ground. In fact, a study by the Reason Foundation finds that over 100 air traffic control centers could be closed if new technologies are adopted for a smaller set of modern facilities that can manage flights “from anywhere-to-anywhere.” These changes would generate a one-time windfall of $1.7 billion as well as annual savings of $1 billion a year.

In addition to obsolete technologies, airport infrastructure improvement projects are hampered by bureaucratic oversight and politically powerful interests — from the air traffic controllers union, to monopolistic airlines with virtual veto power over new gates, to politicians seeking to divert federal dollars to favored projects. Delays and cost overruns plague airport improvement projects, leaving passengers in crowded and dilapidated waiting areas.

A better solution would be to harness the power of entrepreneurship by allowing the private sector to manage airport facilities and the ATC system. The deregulation that began in 1978 needs to be extended to airport facilities and air traffic control as well. The United States is a straggler in this respect, with many countries around the globe already shifting airports and airport management to private companies. From the U.K. to Australia, airports have been shifted towards private management, funded by aviation users. Canada has completely privatized its air traffic control system and is a model for other countries, including the United States. A shift to the private sector would provide access to capital markets to fund the necessary improvements that are fast outstripping the capacity of the Airport Trust Fund and the federal government’s ability to pay.

Unfortunately, the United States has a long way to go before air travel is on solid operational and financial ground. Despite the obvious flaws of the current system, the political interests that have congealed around the status quo make change difficult. Much of this can be explained by what economist Gordon Tullock called the transitional gains trap. That is, the current system bestowed substantial benefits on particular groups, such as the air traffic controllers who continue to man the control towers that would become obsolete in an upgraded system. Or the politicians who see dollars and jobs in airport improvement projects. Tullock notes that over time these benefits dissipate and the programs may become ineffective. Yet change will impose significant costs on these groups, creating a powerful coalition opposing reform.

Federal involvement in air traffic control has a long history. The 1926 Air Commerce Act tasked the Department of Commerce with issuing and enforcing air traffic rules, licensing pilots, certifying aircraft, establishing airways, and operating aids for air navigation. In the mid-1930s, the federal Bureau of Air Commerce took over the initial air traffic control centers for en route tracking created by the airlines, which complemented the operation of local control towers by municipal authorities. During the 1940s, the federal government began taking over the operation of local control towers, and following World War II all aspects of air traffic control became federal.

Airport development took a different path. In the early years of commercial aviation, some private airports (e.g., Burbank, California) existed alongside those established by state and local governments. Today, virtually all U.S. commercial airports are owned by state and local governments. The federal government's role has been to regulate and subsidize those facilities. Federal financial aid to airports began with work relief programs in the 1930s, and was followed by the Federal Airport Act of 1946, which provided $500 million in airport grants to state and local governments over seven years.

The coming of jet aircraft and the large number of aviation accidents spurred Congress to pass the Federal Aviation Act of 1958, which created the Federal Aviation Administration. The new administration replaced previous federal agencies involved in air traffic control and airport development.

Congress started taxing the commercial aviation industry soon after it was established. It passed an excise tax on gasoline and aviation fuels in 1932 and an excise on airline passenger tickets in 1941. The revenue from these levies went into the federal government's general fund. That changed in 1970 when Congress passed legislation creating an Airport and Airway Trust Fund, which had dedicated streams of revenue to be used for air traffic control and federal aid to airports. Trust Fund revenue sources included ticket taxes on domestic and international flights, taxes on fuels, and various fees.

The Airport and Airway Trust Fund currently raises more than $12 billion annually from a 7.5 percent tax on domestic airline tickets, a tax on each segment flown, taxes on gasoline and jet fuel, international departure and arrival taxes, and half a dozen other fees. Trust Fund revenues pay for almost four-fifths of the FAA's $16.4 billion budget, with the balance coming from general federal funds covering the FAA's safety regulatory and miscellaneous other activities.

While air traffic control is an increasingly technology-intensive industry, labor union issues have long played an important role in the ATC system. A period of labor unrest began in the late 1960s as FAA controllers pushed for job improvements and official status as an employee union. In 1969, about 500 members of the Professional Air Traffic Controllers Organization stayed home "sick" causing air service interruptions. The following year, 3,000 PATCO members took part in another "sickout" or illegal strike, which caused chaos for the nation's air traffic.

Labor problems continued during the 1970s, with various work slowdowns and union protests over contract issues. Then in 1981, PATCO declared a major system-wide illegal strike after negotiations on a new contract broke down. That prompted President Ronald Reagan to order controllers to return to work within 48 hours or else face termination. More than 11,000 controllers refused to return to work and were fired by Reagan and initially banned from federal service. PATCO was dissolved and a new controllers union was created in 1987, the National Air Traffic Controllers Association (NATCA).

Today, an important aspect of the federal ATC system is the high labor costs. In 2010, the operations portion of FAA had about 43,000 workers who earned a total of $6.5 billion in wages and benefits, or about $151,000 per worker. Just looking at controllers, a 2005 FAA study found that compensation packages averaged $166,000 annually. Labor costs account for two-thirds of the cost of FAA operations.

While organized labor has created management challenges for the FAA, so has the implementation of new technologies. Delays and cost overruns on major technology projects have been common. For example, the Advanced Automation System project was launched in the early 1980s and was originally expected to cost $2.5 billion and be completed by 1996. But by 1994, estimated project costs had soared to $7.6 billion and the project was seven years behind schedule. The FAA terminated some parts of the AAS program and restructured others, but $1.5 billion of spending ended up being completely wasted.

More recently, a 2005 study by the Department of Transportation's Office of Inspector General looked at 16 major air traffic control upgrade projects and found that the combined costs had risen from $8.9 billion to $14.5 billion. The cost of the Standard Terminal Automation Replacement System project had jumped 194 percent to $2.7 billion and was seven years behind schedule. The OIG said that the STARS project was "facing obsolescence" even before it was completed. Meanwhile, the cost of the GPS controlled Wide Area Augmentation System (WAAS) project had jumped 274 percent to $3.3 billion and was 12 years behind schedule. A Government Accountability Office analysis in 2005 found similar cost overruns and delays in these projects.

Many experts are predicting major problems with U.S. aviation infrastructure in coming years as large demand growth outstrips the capacity of available facilities. In addition to a rising number of airline passengers, the average size of planes has fallen, which increases the number of planes in the sky that the ATC system needs to handle. On the supply side of the aviation equation, the FAA has long had problems with capital funding, high labor costs, and an inability to efficiently implement new technologies. Major changes are needed because the increased air traffic will soon bump up against the limits of the current air traffic control system.

In 1999 I received a consulting contract from the U.S. Trade and Development Agency to provide precise geodetic GPS surveys at 10 airports in Central America. The surveys were needed for the implementation of GPS navigation and approach to the airports. We were also contracted to provide training in the establishment of the Global Navigation Satellite System (GNSS) for airport approach systems.

When this contract was announced at an aviation conference in Miami I gave a presentation to the audience on the purpose of the contract and what we would be providing through USTDA and with the cooperation of FAA. During the dinner I sat at a table with Jane Garvey, the then FAA Administrator and<i>SI Neg. 2001-12304.17. Date: 10/17/2001.</i><br /><br />Jane Garvey, Federal Aviation Administration (FAA) Administrator, speaking at the National Press Club on the state of aviation following the 9/11/01 terrorist attacks. <br /><br />Credit: Jim Wallace (Smithsonian Institution) gave her a more detailed explanation of what we would be doing and how the GNSS would be a tremendous benefit to civil aviation in the region. Ms. Garvey was quick to grasp the technology and its benefits. When I asked her why the United States was not moving forward with this less labor intensive and less expensive technology her answer was simple and direct — “it’s the unions.” She explained that any new technology introduced into the ATC system had to be approved by the NATCA. The approval was not for the viability of the technology or the safety of the airways but for the impact the technology would have on the union jobs of the air controllers. This did not bother the aviation officials in Central America as they were more concerned with implementing an ATC system they could readily afford and one that would satisfy the airlines serving the region.

Virtually all commercial airports in the United States are owned by state and local governments. But around the world, airports are becoming viewed more as business enterprises, and less as monopoly public services. Governments in both developed and developing countries are turning to the private sector for airport management and development.

The benefits of a more entrepreneurial approach to running airports include increased operating efficiency, improved amenities, and more rapid and efficient expansion in capacity to reduce congestion. Airlines, passengers, private-plane owners, and taxpayers can all benefit from this new commercial approach to airport management.

For existing state and local airports, the simplest form of privatization is to contract out management of the airport on a short-term basis. But long-term leases can shift much greater responsibility and entrepreneurial incentive to the airport company, while liberating much of the city's previous investment in the airport. To create new airport facilities, the private sector can be brought in as a partner and granted either a long-term or perpetual franchise to finance, design, own, and operate the new facility. Full private ownership and management of airports is also possible and is becoming fairly common in Europe.

Airports have been fully or partly privatized in many foreign cities, including Amsterdam, Athens, Auckland, Brussels, Copenhagen, Frankfurt, London, Melbourne, Naples, Rome, Sydney, and Vienna. Britain led the way with the 1987 privatization of British Airports Authority, which owns Heathrow and other airports. Other countries followed with a wide range of commercialization reforms under which private firms own or operate various aspects of airport facilities.

Since 1987, more than 100 airports have been partly or fully privatized worldwide. A recent survey found that there are about 100 companies around the world that own and operate airports, finance airport privatization, or participate in projects to finance, design, build and operate new airports or airport terminals.

Many aviation experts predict serious trouble in coming years as air travel demand grows faster than the ability of the U.S. air traffic control system to expand capacity. In the 2003 reauthorization of the FAA, Congress acknowledged the seriousness of the problem by creating the Joint Planning and Development Office (JPDO) to coordinate the transition to a Next Generation Air Transportation System (NextGen). NextGen will be a major redesign of the ATC infrastructure, as described by the Congressional Budget Office:

“The new system is designed to accommodate up to three times the volume of current air traffic by making more efficient use of both the national airspace and airport facilities. The new air traffic control system would be more decentralized than the one currently in place in the United States. Guidance systems on planes would work in conjunction with satellites of the Global Positioning System (GPS) to supplement direct supervision by ground-based controllers and radar stations. As a result, each plane would depend less on instructions from an air traffic controller and more on its own resources for maintaining a safe flight pattern and would be better able to adjust to the particular air traffic conditions in its vicinity.”

The JPDO has estimated that not expanding the ATC system's capacity will be costing the U.S. economy $40 billion per year by 2020 because the overburdened system will force significant rationing of flights. That rationing would increase prices and eliminate some trips entirely. To avoid this crisis, JPDO has called for restructuring the ATC system to safely and efficiently handle the heavier demand.

One problem is the mismatch between the growth in air traffic and the projected growth in FAA revenue. The FAA will need about $1 billion more per year over the next 20 years just to implement NextGen. In 2007 the FAA proposed a user-fee-based funding reform that could provide a more efficient and growing revenue source. The idea was to make each air transportation user's burden on the ATC system more closely match that entity's cost for using the system. That approach has thus far been ignored by Congress.

However, the challenge ahead for the ATC system is more complex than just financial. NextGen will be a major paradigm shift — from 20th-century (manual) air traffic control to 21st-century (semi-automated) air traffic management — and it will be more complex and riskier than any other challenge the FAA has previously attempted. Given the FAA's management and cost overrun problems in the past, simply fixing the funding problem for the ATC system without dramatically reforming its governance poses risks of larger and more dramatic failures and greater congestion down the road.

Here are three key problems with the current government-owned and operated system of air traffic control:

Inflexible Funding. Government funding sources tend to be static and subject to political considerations, and they are decoupled from changing market demands. Changes in aviation over the past decade have hurt the FAA's funding base. A large part of the FAA budget comes from aviation excise taxes, especially the 7.5 percent tax on airline tickets. As average ticket prices have fallen over time, ATC funding has been squeezed. Payroll costs of the current labor-intensive ATC system consume most of the available budget, leaving less funding for capital investment.

Making the transition to NextGen will require billions of dollars of new investments in advanced technologies. The FAA's capital budget is still focused mostly on patching up the existing system, such as replacing antiquated display consoles. Such investments are needed in the short-term, but won't add very much capacity to the system. But that is nearly all the FAA can afford under the current funding structure.

Some people argue that Congress could solve the funding problem by appropriating a larger amount of general federal revenue for the ATC system. But given the giant federal budget deficit, federal discretionary spending is going to be severely squeezed in coming years. The solution, as discussed below, is to create a commercialized ATC system that can flexibly respond to changing conditions and access private capital markets for investment.

Technology Implementation Risks. The FAA has been attempting to modernize its system, expand capacity, and increase its productivity for decades. But dozens of reports over the years from the Government Accountability Office and the Office of Inspector General in the Department of Transportation have faulted the FAA for poor management of major projects, which are often delayed and over budget. The Advanced Automation System, Wide Area Augmentation System, and other major projects have had large cost overruns and been years behind schedule or cancelled, as discussed above.

In 2005 two OIG researchers presented an overview of the FAA's failed efforts over the years to modernization the National Airspace System.25 In reviewing what went wrong, they concluded that FAA modernization efforts had neither reduced costs nor increased productivity:

“NAS modernization plans have been consistently subverted by requirements growth, development delays, cost escalations, and inadequate benefits management. All these things were symptomatic of the fact that FAA didn't think it needed to reduce operating costs.”

Many experts are greatly concerned that the FAA's institutional culture is poorly suited to implementing anything as dramatic as NextGen. In 2004, the National Academy of Sciences convened an expert panel to assist the GAO in understanding the cultural and technical factors that have impeded previous ATC modernization efforts. It found that "the key cultural factor impeding modernization has been resistance to change, which is characteristic of FAA personnel at all levels" and that "the key technical factor affecting modernization has been a shortfall in the technical expertise needed to design, develop, or manage complex air traffic systems."

As a government agency, the FAA is not designed to judge risks, aim at the most efficient investments, manage people to produce results, reward excellence, or punish incompetence. It is therefore not equipped to fundamentally reform the ATC system. Thus, major institutional change is probably a prerequisite for implementing the advanced ATC system the nation needs to meet rising aviation demand. This echoes Jane Garvey’s comments to me in 1999.

Political Constraints. A third impediment to ATC reform is political. The redesign of the ATC system foreseen in NextGen could potentially deliver major cost savings and greatly expand ATC capacity. However, realizing those gains would require retirement of large numbers of costly radars and other ground-based navigation aids and the consolidation of ATC facilities. One current proposal would replace 21 en route centers and 171 terminal radar approach control (TRACON) facilities with just 35 air traffic service hubs in a redesign of U.S. airspace. 28 Physical control towers located at many smaller airports would gradually be phased out as "virtual tower" functions are built into the new super-hubs.

However, Congress tends to resist consolidating ATC facilities because of concerns about job losses and the like, which is similar to the political resistance to closing post offices and military bases. A major 1982 proposal for consolidating ATC facilities was quietly dropped after it became clear that getting it through Congress would be very difficult. Similarly, Congress came extremely close to forbidding the FAA's recent success in outsourcing its Flight Service Station system, which involved reducing the system from 58 facilities to 20. The prohibition was defeated only by a credible veto threat from the Bush White House. In sum, as long as ATC remains government-owned and controlled, making the needed reforms to improve efficiency and implement NextGen will be very difficult.

In 1999 and 2001 I spent a great deal of time at the FAA headquarters in Washington, D.C and in offices of Representatives Don Young (R-Alaska) the then Chairman of the House Transportation and Infrastructure Committee and John Mica (R-Florida) the then Chairman of the Committee on Aviation. During one meeting with Rep. Young I explained what we were doing in Central America with GNSS and he was flabbergasted that he was not aware of this project. He was more annoyed that ate the current time Congress was holding hearings on the cost overruns of Lockheed-Martin’s STARS system. That’s the last I ever heard of GNSS implementation. Evidently Lockheed Martin had way more political and financial clout than one obscure consultant.

The way to address all three of these organizational problems is to take the ATC system out of the federal budget process and make it a self-supporting entity, funded directly by its customers. Variants of this commercialization approach have been recommended by a series of federal studies and commissions over the past 15 years.

As part of Vice President Al Gore's efforts at "reinventing government" in the 1990s, for example, the Clinton administration proposed turning the ATC system into a separate, self-funded, nonprofit government corporation within the Department of Transportation. The 1997 National Civil Aviation Review Commission, which was chaired by Norman Mineta, similarly proposed moving toward a self-supporting air traffic control organization.

Commercialization would entail shifting from aviation-related taxes paid to the U.S. Treasury to fees for ATC services paid directly by customers to a new self-supporting Air Traffic Organization (ATO). This change would allow fees to grow in proportion to the growth of flight activity, rather than being tied to a less-stable variable, such as fuel prices or airline ticket prices. Moreover, a predictable revenue stream that was not subject to the federal budget process would provide the basis for the ATO to issue long-term bonds for funding capital investments.

Commercialization would also address the management problems that have plagued the FAA's efforts to modernize. A non-civil-service ATO could attract the best private-sector managers and engineers skilled at implementing complex technology projects. Such an ATO could hire, fire, and compensate its employees as other high-tech businesses do. Private sector managers would have an incentive to ask tough questions about whether new investments offered real value for the money, a process that often doesn't occur at the FAA or in Congress.

In addition, a separate, self-supporting ATO—no longer part of the FAA—would be overseen at arm's length for aviation safety by the remaining FAA. Numerous studies have pointed out that the FAA's air-safety role is compromised when it comes to the ATC system, since that system is operated "in-house" by a different branch of the same FAA. All other players in aviation—pilots, mechanics, aircraft manufacturers, airlines, and so forth—are regulated at arm's length for safety by the FAA. This separation of ATC operations from safety regulation is especially critical given the major changes entailed by shifting to the semi-automated NextGen, where numerous safety versus capacity questions will need to be addressed in a rigorous and transparent manner.

Finally, a self-supporting ATO would address the political obstacles to improving system efficiency, such as making decisions to close facilities. By passing the enabling legislation for ATC reform, Congress would delegate such contentious issues to the customer-oriented ATO organization.

During the past two decades, nearly 50 governments have commercialized their air traffic control systems. That means they have separated their ATC activities from their transport ministries, removed them from the civil service, and made them self-supporting from fees charged to aircraft operators. These new air navigation service providers (ANSPs) are usually regulated at arm's length by their government's aviation safety agency.

Britain's ATC system has been commercialized by means of a "public-private partnership." National Air Traffic Services (NATS) is a jointly owned company, with British airlines owning 42 percent, airport company BAA owning 4 percent, employees owning 5 percent, and the government owning the remaining minority stake. NATS is operated on a not-for-profit basis.

Canada's ATC system has been fully commercialized. In 1996, Canada set up a private, nonprofit ATC corporation, Nav Canada, which is self-supporting from charges on aviation users. The Canadian system has been widely praised for its sound finances, solid management, and its investment in new technologies.31 The Canadian system is a very good reform model for the United States to consider.

Nav Canada's corporate board is composed largely of aviation stakeholders. It has 4 seats for the airlines, 3 for the government, 2 for employees, and 1 for the non-commercial aviation industry. Those 10 stakeholders select 4 directors from outside aviation, and then those 14 select the company president, who becomes the 15th board member. To further strengthen governance, neither elected officials nor anyone connected with suppliers to Nav Canada can serve on the board. Nav Canada also has a 20-member outside Advisory Committee.

A number of studies have found that ATC commercialization has generally resulted in improvements to service quality, better management, and reduced costs. At the same time, air safety has remained the same or improved in the countries that have pursued reforms to set up independent ANSP organizations.

A thorough 2009 report by Glen McDougall and Alasdair Roberts compared the performance of 10 commercialized ATC systems and the FAA during the 1997 to 2004 period. They looked at large amounts of performance and safety data from the systems in the various countries and conducted over 200 interviews with managers, workers, and users of the different systems. The researchers found:

“ANSP commercialization has generally achieved its objectives. Service quality has improved in most cases. Several ANSPs have successfully modernized workplace technologies. The safety records of ANSPs are not adversely affected by commercialization and in some cases safety is improved. Costs are generally reduced, sometimes significantly. Other risks of commercialization—such as erosion of accountability to government, deterioration of labor relations, or worsened relationships between civil and military air traffic controllers—have not materialized.”

For the United States, a commercialized ATC organization would be more likely than the FAA to efficiently implement the major aviation infrastructure advances that the nation desperately needs. Air traffic control is more complex and dynamic than ever, and it needs to be managed in the sort of efficient and flexible manner that only a commercialized environment can offer. Countries like Canada have shown the way forward for air traffic control, and U.S. policymakers should adopt the proven organizational reforms that have been implemented abroad.

As you can see from this long report sequestration did not have a damn thing to do shutting down ATC control; towers and furloughing civil service employees. This was merely Obama’s way of creating pain for the air travelers so he could get the public behind him in his fight with Congress. It was petty, childish and mean. But like the scorpion in Alsop’s fable of he scorpion and the frog Obama was merely being a scorpion and reverting to his Saul Alinsky playbook on politics.

Air travel has become an inconvenience, and it will only get worse in the future. Congress rescued the flying public from the burden of sequestration, but has done little to address the more serious concerns about the future of aviation. The federal budget — with a debt ceiling looming and a growing entitlement problem — is hardly up to the task of bringing air travel into the 21st century. The United States should take its cue from the countries around the world that have turned to the private sector to build the air transport systems of the future. We have the technology and we have the skills. If Costa Rica, Nicaragua, Guatemala, and Honduras can do it we certainly can if we have the political will. Next we need to privatize the TSA!